Lake Shore Electric (LSE) was selected as the low-voltage equipment supplier for Greenlane Infrastructure’s first electric vehicle (EV) charging location in Colton, California.
Increasing demand in the electrical equipment supplier market for prefabricated electrical buildings has driven lead times to over a year, limiting the ability to deliver customized solutions competitively.
A major player in the EPC/Design-Build industry for Utility Scale Battery Energy Storage Systems faced significant financial challenges due to delays in receiving UL 891 switchboards.